Project Details
Project Alignment
MRT Orange Line (east) “Thailand Cultural Center – Min Buri” is both underground and elevated transit system included within an approximate distance of 22.57 km. The project alignment starts with the underground section at Thailand Cultural Center, which connected to MRT Chalermratchamongkol Line, runs through MRTA area then underneath Rama IX road and Chalongrat Expressway then turn left and runs along Ramkhamhaeng road and passes Lam Sali Intersection, here turns into an elevated section near Sammakorn Village, then passes Kanchanapisek Intersection and terminates at Suwinthawong station located near Ramkhamhaeng – Suwinthawong Intersection. In total, MRT Orange Line (east), consists of 10 underground stations, 7 elevated stations, 11 intervention shafts, a depot and a Park&Ride facilities.